Files
Matt b5425e705e
All checks were successful
Build and Push Docker Image / build (push) Successful in 10m33s
Apply full refactor updates plus pipeline/email UX confirmations
2026-02-14 15:26:42 +01:00

24 lines
733 B
Markdown

# Phase 02 Overview: Backend Orchestration Engine
## Objective
Implement deterministic runtime behavior for stage transitions, routing, filtering, assignment, live cursor control, and notification/audit emission.
## In Scope
- transition engine
- routing engine
- filtering orchestration (gates + AI + manual queue)
- assignment orchestration with coverage guarantees
- live cursor and cohort window controls
- event and audit emission
## Out of Scope
- full admin UI and participant UI implementation
## Exit Criteria
1. Runtime contracts implemented and integration-tested.
2. Determinism and idempotency guarantees proven for critical mutations.
3. Mandatory phase gates complete with test evidence.