Full pipeline/track/stage architecture replacing the legacy round system. Schema: 11 new models (Pipeline, Track, Stage, StageTransition, ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor, OverrideAction, AudienceVoter) + 8 new enums. Backend: 9 new routers (pipeline, stage, routing, stageFiltering, stageAssignment, cohort, live, decision, award) + 6 new services (stage-engine, routing-engine, stage-filtering, stage-assignment, stage-notifications, live-control). Frontend: Pipeline wizard (17 components), jury stage pages (7), applicant pipeline pages (3), public stage pages (2), admin pipeline pages (5), shared stage components (3), SSE route, live hook. Phase 6 refit: 23 routers/services migrated from roundId to stageId, all frontend components refitted. Deleted round.ts (985 lines), roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx, 10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs. Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing, TypeScript 0 errors, Next.js build succeeds, 13 integrity checks, legacy symbol sweep clean, auto-seed on first Docker startup. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
40 lines
1.0 KiB
Markdown
40 lines
1.0 KiB
Markdown
# Release Runbook (Atomic Cutover)
|
|
|
|
## Preconditions
|
|
|
|
- all prior phase gates complete
|
|
- signed release checklist
|
|
- rollback owner and communication owner assigned
|
|
|
|
## Cutover Sequence
|
|
|
|
1. freeze non-release writes and announce maintenance window
|
|
2. execute final backup snapshot
|
|
3. deploy release candidate build
|
|
4. run reset/reseed as planned for production state model
|
|
5. run post-deploy integrity and smoke checks
|
|
6. run mandatory critical-path E2E subset
|
|
7. publish completion and monitor
|
|
|
|
## Immediate Post-Cutover Checks
|
|
|
|
- auth and role gating paths
|
|
- transition mutation sanity
|
|
- assignment preview/execute path
|
|
- live cursor operations
|
|
- audience vote acceptance and dedupe
|
|
- reporting endpoint correctness
|
|
|
|
## Rollback Trigger Conditions
|
|
|
|
- integrity check failures
|
|
- critical mutation path failure
|
|
- unacceptable error-rate spike
|
|
|
|
## Rollback Plan (High Level)
|
|
|
|
- restore backup snapshot
|
|
- redeploy previous stable build
|
|
- validate critical-path smoke tests
|
|
- issue incident communication and postmortem schedule
|