Files
Matt 331b67dae0 Round system redesign: Phases 1-7 complete
Full pipeline/track/stage architecture replacing the legacy round system.

Schema: 11 new models (Pipeline, Track, Stage, StageTransition,
ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor,
OverrideAction, AudienceVoter) + 8 new enums.

Backend: 9 new routers (pipeline, stage, routing, stageFiltering,
stageAssignment, cohort, live, decision, award) + 6 new services
(stage-engine, routing-engine, stage-filtering, stage-assignment,
stage-notifications, live-control).

Frontend: Pipeline wizard (17 components), jury stage pages (7),
applicant pipeline pages (3), public stage pages (2), admin pipeline
pages (5), shared stage components (3), SSE route, live hook.

Phase 6 refit: 23 routers/services migrated from roundId to stageId,
all frontend components refitted. Deleted round.ts (985 lines),
roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx,
10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs.

Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing,
TypeScript 0 errors, Next.js build succeeds, 13 integrity checks,
legacy symbol sweep clean, auto-seed on first Docker startup.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 13:57:09 +01:00

31 lines
898 B
Markdown

# Phase 02 Tasks
## Transition Engine
- [ ] Implement transition guard and mutation logic.
- [ ] Implement optimistic concurrency handling.
- [ ] Implement transition event and audit emission.
## Filtering and Routing
- [ ] Implement deterministic gate-first pipeline.
- [ ] Implement confidence band decision handling.
- [ ] Implement routing rule engine with explainability payloads.
## Assignment
- [ ] Implement assignment preview and execute parity.
- [ ] Implement coverage guarantee and overflow semantics.
- [ ] Implement assignment metrics output.
## Live Runtime
- [ ] Implement admin cursor operations and conflict-safe update model.
- [ ] Implement cohort window control.
- [ ] Implement real-time event propagation path.
## Notifications and Audit
- [ ] Implement default event producers for stage transitions and outcomes.
- [ ] Implement immutable audit payload structure.