Full pipeline/track/stage architecture replacing the legacy round system. Schema: 11 new models (Pipeline, Track, Stage, StageTransition, ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor, OverrideAction, AudienceVoter) + 8 new enums. Backend: 9 new routers (pipeline, stage, routing, stageFiltering, stageAssignment, cohort, live, decision, award) + 6 new services (stage-engine, routing-engine, stage-filtering, stage-assignment, stage-notifications, live-control). Frontend: Pipeline wizard (17 components), jury stage pages (7), applicant pipeline pages (3), public stage pages (2), admin pipeline pages (5), shared stage components (3), SSE route, live hook. Phase 6 refit: 23 routers/services migrated from roundId to stageId, all frontend components refitted. Deleted round.ts (985 lines), roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx, 10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs. Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing, TypeScript 0 errors, Next.js build succeeds, 13 integrity checks, legacy symbol sweep clean, auto-seed on first Docker startup. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
15 lines
413 B
Markdown
15 lines
413 B
Markdown
# Phase 01 Acceptance Gates
|
|
|
|
- [ ] G-01-1 `prisma generate` succeeds
|
|
- [ ] G-01-2 reset/reseed succeeds in local and staging
|
|
- [ ] G-01-3 integrity queries return expected zero-error results
|
|
- [ ] G-01-4 required indexes confirmed in DB metadata
|
|
- [ ] G-01-5 phase artifacts stored and linked
|
|
|
|
## Required Evidence
|
|
|
|
- migration command output
|
|
- reseed logs
|
|
- integrity query result captures
|
|
- schema diff summary
|