Files
Matt 331b67dae0 Round system redesign: Phases 1-7 complete
Full pipeline/track/stage architecture replacing the legacy round system.

Schema: 11 new models (Pipeline, Track, Stage, StageTransition,
ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor,
OverrideAction, AudienceVoter) + 8 new enums.

Backend: 9 new routers (pipeline, stage, routing, stageFiltering,
stageAssignment, cohort, live, decision, award) + 6 new services
(stage-engine, routing-engine, stage-filtering, stage-assignment,
stage-notifications, live-control).

Frontend: Pipeline wizard (17 components), jury stage pages (7),
applicant pipeline pages (3), public stage pages (2), admin pipeline
pages (5), shared stage components (3), SSE route, live hook.

Phase 6 refit: 23 routers/services migrated from roundId to stageId,
all frontend components refitted. Deleted round.ts (985 lines),
roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx,
10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs.

Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing,
TypeScript 0 errors, Next.js build succeeds, 13 integrity checks,
legacy symbol sweep clean, auto-seed on first Docker startup.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 13:57:09 +01:00

32 lines
1.2 KiB
Markdown

# Phase 00 Tasks
## Task Set A: Contract Alignment
- [ ] Validate `shared/domain-model.md` against current repository constraints.
- [ ] Validate `shared/api-contracts.md` names and payload conventions with router ownership.
- [ ] Validate event naming strategy with notification and webhook owners.
## Task Set B: Governance Lock
- [ ] Confirm `shared/decision-log.md` with Product + Engineering.
- [ ] Confirm cutover/no-compatibility policy in writing.
- [ ] Confirm override governance requirements and mandatory reason fields.
## Task Set C: Access and Security
- [ ] Validate `shared/authz-matrix.md` for each role.
- [ ] Define scope enforcement standard for program-scoped admin actions.
- [ ] Confirm audience vote abuse controls (token, rate-limit, dedupe key).
## Task Set D: Validation Baseline
- [ ] Validate `shared/test-matrix.md` coverage and practicality.
- [ ] Map each test ID to ownership.
- [ ] Confirm CI entry strategy for U/I/E/P layers.
## Task Set E: Risk Baseline
- [ ] Review `shared/risk-register.md` with owners.
- [ ] Add any repository-specific risks identified during contract review.
- [ ] Mark mitigation action owner and due phase per risk.