Full pipeline/track/stage architecture replacing the legacy round system. Schema: 11 new models (Pipeline, Track, Stage, StageTransition, ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor, OverrideAction, AudienceVoter) + 8 new enums. Backend: 9 new routers (pipeline, stage, routing, stageFiltering, stageAssignment, cohort, live, decision, award) + 6 new services (stage-engine, routing-engine, stage-filtering, stage-assignment, stage-notifications, live-control). Frontend: Pipeline wizard (17 components), jury stage pages (7), applicant pipeline pages (3), public stage pages (2), admin pipeline pages (5), shared stage components (3), SSE route, live hook. Phase 6 refit: 23 routers/services migrated from roundId to stageId, all frontend components refitted. Deleted round.ts (985 lines), roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx, 10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs. Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing, TypeScript 0 errors, Next.js build succeeds, 13 integrity checks, legacy symbol sweep clean, auto-seed on first Docker startup. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
1.2 KiB
1.2 KiB
Phase 00 Tasks
Task Set A: Contract Alignment
- Validate
shared/domain-model.mdagainst current repository constraints. - Validate
shared/api-contracts.mdnames and payload conventions with router ownership. - Validate event naming strategy with notification and webhook owners.
Task Set B: Governance Lock
- Confirm
shared/decision-log.mdwith Product + Engineering. - Confirm cutover/no-compatibility policy in writing.
- Confirm override governance requirements and mandatory reason fields.
Task Set C: Access and Security
- Validate
shared/authz-matrix.mdfor each role. - Define scope enforcement standard for program-scoped admin actions.
- Confirm audience vote abuse controls (token, rate-limit, dedupe key).
Task Set D: Validation Baseline
- Validate
shared/test-matrix.mdcoverage and practicality. - Map each test ID to ownership.
- Confirm CI entry strategy for U/I/E/P layers.
Task Set E: Risk Baseline
- Review
shared/risk-register.mdwith owners. - Add any repository-specific risks identified during contract review.
- Mark mitigation action owner and due phase per risk.