Full pipeline/track/stage architecture replacing the legacy round system. Schema: 11 new models (Pipeline, Track, Stage, StageTransition, ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor, OverrideAction, AudienceVoter) + 8 new enums. Backend: 9 new routers (pipeline, stage, routing, stageFiltering, stageAssignment, cohort, live, decision, award) + 6 new services (stage-engine, routing-engine, stage-filtering, stage-assignment, stage-notifications, live-control). Frontend: Pipeline wizard (17 components), jury stage pages (7), applicant pipeline pages (3), public stage pages (2), admin pipeline pages (5), shared stage components (3), SSE route, live hook. Phase 6 refit: 23 routers/services migrated from roundId to stageId, all frontend components refitted. Deleted round.ts (985 lines), roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx, 10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs. Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing, TypeScript 0 errors, Next.js build succeeds, 13 integrity checks, legacy symbol sweep clean, auto-seed on first Docker startup. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
867 B
867 B
Phase 00 Overview: Contract Freeze
Objective
Lock all cross-phase contracts before implementation so the program executes with stable boundaries and no semantic drift.
In Scope
- decision locking
- API/type contract baseline
- authorization baseline
- gate and evidence baseline
- initial risk baseline
Out of Scope
- schema implementation
- runtime implementation
- UI implementation
Inputs
shared/program-charter.mdshared/decision-log.mdshared/domain-model.mdshared/api-contracts.mdshared/authz-matrix.mdshared/test-matrix.md
Exit Criteria
- Decision log marked locked with no unresolved critical decision.
- API/type contracts accepted by backend and frontend owners.
- Authz matrix accepted by security owner.
- Risk register initialized with owners.
- Phase 00 acceptance gates complete with evidence.