Files
Matt 331b67dae0 Round system redesign: Phases 1-7 complete
Full pipeline/track/stage architecture replacing the legacy round system.

Schema: 11 new models (Pipeline, Track, Stage, StageTransition,
ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor,
OverrideAction, AudienceVoter) + 8 new enums.

Backend: 9 new routers (pipeline, stage, routing, stageFiltering,
stageAssignment, cohort, live, decision, award) + 6 new services
(stage-engine, routing-engine, stage-filtering, stage-assignment,
stage-notifications, live-control).

Frontend: Pipeline wizard (17 components), jury stage pages (7),
applicant pipeline pages (3), public stage pages (2), admin pipeline
pages (5), shared stage components (3), SSE route, live hook.

Phase 6 refit: 23 routers/services migrated from roundId to stageId,
all frontend components refitted. Deleted round.ts (985 lines),
roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx,
10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs.

Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing,
TypeScript 0 errors, Next.js build succeeds, 13 integrity checks,
legacy symbol sweep clean, auto-seed on first Docker startup.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 13:57:09 +01:00

867 B

Phase 00 Overview: Contract Freeze

Objective

Lock all cross-phase contracts before implementation so the program executes with stable boundaries and no semantic drift.

In Scope

  • decision locking
  • API/type contract baseline
  • authorization baseline
  • gate and evidence baseline
  • initial risk baseline

Out of Scope

  • schema implementation
  • runtime implementation
  • UI implementation

Inputs

  • shared/program-charter.md
  • shared/decision-log.md
  • shared/domain-model.md
  • shared/api-contracts.md
  • shared/authz-matrix.md
  • shared/test-matrix.md

Exit Criteria

  1. Decision log marked locked with no unresolved critical decision.
  2. API/type contracts accepted by backend and frontend owners.
  3. Authz matrix accepted by security owner.
  4. Risk register initialized with owners.
  5. Phase 00 acceptance gates complete with evidence.