Files
MOPC-Portal/docs/round-redesign-architecture-docs/mixed-round-design-implementation-docs/shared/risk-register.md
Matt b5425e705e
All checks were successful
Build and Push Docker Image / build (push) Successful in 10m33s
Apply full refactor updates plus pipeline/email UX confirmations
2026-02-14 15:26:42 +01:00

1.3 KiB

Risk Register

ID Risk Probability Impact Mitigation Owner Status
R-001 Hidden legacy coupling after schema rebuild Medium High Mandatory symbol sweeps + module refit gates Eng Lead Open
R-002 Assignment coverage edge-case failures at scale Medium High Hard overflow policy + P-001 load tests Backend Lead Open
R-003 Award governance permission drift Low High explicit authz tests for each decision mode Security Lead Open
R-004 Live cursor race conditions during events Medium High optimistic lock + replay-safe event handling Realtime Lead Open
R-005 Audience vote dedupe regressions Medium Medium dedupe key contract + E-007 + I-007 tests Backend Lead Open
R-006 Migration/reseed script incompleteness Low High repeatable reset/reseed rehearsals DB Owner Open
R-007 Reporting consumers break on contract shift Medium Medium phase-06 consumer validation checklist Data Lead Open
R-008 Scope creep during dependency refit High Medium strict out-of-scope policy, defer noncritical features PM Open

Risk Handling Policy

  • High impact items require explicit mitigation evidence before phase close.
  • Open high/high risks block release in Phase 07.