Files
Matt b5425e705e
All checks were successful
Build and Push Docker Image / build (push) Successful in 10m33s
Apply full refactor updates plus pipeline/email UX confirmations
2026-02-14 15:26:42 +01:00

1.2 KiB

Phase 00 Tasks

Task Set A: Contract Alignment

  • Validate shared/domain-model.md against current repository constraints.
  • Validate shared/api-contracts.md names and payload conventions with router ownership.
  • Validate event naming strategy with notification and webhook owners.

Task Set B: Governance Lock

  • Confirm shared/decision-log.md with Product + Engineering.
  • Confirm cutover/no-compatibility policy in writing.
  • Confirm override governance requirements and mandatory reason fields.

Task Set C: Access and Security

  • Validate shared/authz-matrix.md for each role.
  • Define scope enforcement standard for program-scoped admin actions.
  • Confirm audience vote abuse controls (token, rate-limit, dedupe key).

Task Set D: Validation Baseline

  • Validate shared/test-matrix.md coverage and practicality.
  • Map each test ID to ownership.
  • Confirm CI entry strategy for U/I/E/P layers.

Task Set E: Risk Baseline

  • Review shared/risk-register.md with owners.
  • Add any repository-specific risks identified during contract review.
  • Mark mitigation action owner and due phase per risk.