--- gsd_state_version: 1.0 milestone: v1.0 milestone_name: milestone status: in_progress last_updated: "2026-02-27T08:48:11Z" progress: total_phases: 4 completed_phases: 1 total_plans: 10 completed_plans: 6 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-02-26) **Core value:** Admins can describe ranking criteria in natural language, the system interprets and ranks projects accordingly, and they can advance the top projects to the next round with one click — all with full override control. **Current focus:** Phase 2 — Ranking Dashboard UI ## Current Position Phase: 2 of 4 (Ranking Dashboard UI) Plan: 2 of 3 in current phase (Phase 2 Plan 2 complete) Status: In progress Last activity: 2026-02-27 — Plan 02-02 complete: Full RankingDashboard with drag-and-drop, AI vs override badges, Sheet detail panel Progress: [█████░░░░░] ~60% ## Performance Metrics **Velocity:** - Total plans completed: 5 - Average duration: ~5 min - Total execution time: ~23 min **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 01-ai-ranking-backend | 4 | ~18 min | ~5 min | | 02-ranking-dashboard-ui | 1 | ~5 min | ~5 min | **Recent Trend:** - Last 5 plans: 01-02 (~3 min), 01-03 (~4 min), 01-04 (~8 min), 02-01 (~5 min), 02-02 (~8 min) - Trend: Fast (service-layer + UI implementation tasks) *Updated after each plan completion* | Phase 02-ranking-dashboard-ui P01 | 5 | 2 tasks | 3 files | | Phase 02-ranking-dashboard-ui P02 | 8 | 1 task | 1 file | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - [Init]: RankingSnapshot model (new table) preferred over Round.metadataJson for audit history — confirm with client before writing migration - [Init]: Per-category processing (STARTUP / BUSINESS_CONCEPT) — two parallel AI calls, not one combined call - [Init]: Phase 4 is independent and can be parallelized with Phases 2-3 - [01-01]: Used separate relation names per FK pair (RoundRankingSnapshots / TriggeredRankingSnapshots) — Prisma requires unique relation names per FK, not per target model - [01-01]: All EvaluationConfig ranking fields are optional/defaulted for backward compatibility with existing rounds - [01-01]: Created migration SQL manually (20260227000000_add_ranking_snapshot) — local DB credentials unavailable; migration applies on next deploy - [01-02]: fetchAndRankCategory exported (not private) so tRPC router can execute pre-parsed rules without re-parsing - [01-02]: Projects with zero SUBMITTED evaluations excluded from ranking entirely (not ranked last) - [01-02]: PrismaClient imported as real type (not import type) so transaction clients are compatible - [01-03]: Typed arrays cast to Prisma.InputJsonValue via `unknown` (direct cast rejected by strict TS — no index signature) - [01-03]: getSnapshot uses findUnique + manual TRPCError NOT_FOUND (findUniqueOrThrow gives INTERNAL_SERVER_ERROR) - [Phase 01-04]: triggerAutoRankIfComplete defined as module-level non-exported function in evaluation.ts — avoids circular imports, colocated with the mutation it serves - [Phase 01-04]: EvaluationConfig null fallback typed as {} as EvaluationConfig — required for TypeScript strict mode to recognize rankingCriteria and autoRankOnComplete fields - [Phase 01-04]: retroactiveScan uses RETROACTIVE triggerType to distinguish from MANUAL/AUTO/QUICK — prevents duplicate re-runs on subsequent scans - [02-01]: ReorderEvent type defined locally in ranking.ts (not exported) — only consumed by saveReorder procedure - [02-01]: saveReorder is append-only: full ordered list stored per event, latest entry per category = current admin order, gives full audit trail - [02-02]: Double cast (as unknown as RankedProjectEntry[]) required for Prisma JsonValue — direct cast rejected by TypeScript strict mode - [02-02]: getFullDetail returns { project, assignments, stats } shape — title accessed via .project.title not root level - [02-02]: saveReorder has no onSuccess invalidation — avoids re-fetch that would reset localOrder and cause snap-back ### Pending Todos None yet. ### Blockers/Concerns - [Phase 1]: French/English variable naming for EmailTemplate bilingual fields needs client confirmation before Phase 3 schema migration - [Phase 1]: Poste.io bulk-send rate limits need verification before Phase 3 load testing - [Phase 3]: Tiptap Mention extension API in v3.x should be validated against Tiptap v3 docs before implementation ## Session Continuity Last session: 2026-02-27 Stopped at: Completed 02-02-PLAN.md (Full RankingDashboard with drag-and-drop, AI vs override badges, Sheet detail panel) Resume file: None