Commit Graph

5 Commits

Author SHA1 Message Date
a39e27f6ff fix: applicant portal — document uploads, round filtering, auth hardening
Fix round-specific document uploads (submittedAt no longer blocks uploads),
add view/download buttons for existing files, enforce active-round-only for
uploads/deletes. Harden auth layout and set-password page. Filter applicant
portal rounds by award track membership.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-04 13:29:39 +01:00
6ca39c976b Competition/Round architecture: full platform rewrite (Phases 1-9)
All checks were successful
Build and Push Docker Image / build (push) Successful in 7m45s
Replace Pipeline/Stage system with Competition/Round architecture.
New schema: Competition, Round (7 types), JuryGroup, AssignmentPolicy,
ProjectRoundState, DeliberationSession, ResultLock, SubmissionWindow.
New services: round-engine, round-assignment, deliberation, result-lock,
submission-manager, competition-context, ai-prompt-guard.
Full admin/jury/applicant/mentor UI rewrite. AI prompt hardening with
structured prompts, retry logic, and injection detection. All legacy
pipeline/stage code removed. 4 new migrations + seed aligned.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-15 23:04:15 +01:00
Matt
b5425e705e Apply full refactor updates plus pipeline/email UX confirmations
All checks were successful
Build and Push Docker Image / build (push) Successful in 10m33s
2026-02-14 15:26:42 +01:00
331b67dae0 Round system redesign: Phases 1-7 complete
Full pipeline/track/stage architecture replacing the legacy round system.

Schema: 11 new models (Pipeline, Track, Stage, StageTransition,
ProjectStageState, RoutingRule, Cohort, CohortProject, LiveProgressCursor,
OverrideAction, AudienceVoter) + 8 new enums.

Backend: 9 new routers (pipeline, stage, routing, stageFiltering,
stageAssignment, cohort, live, decision, award) + 6 new services
(stage-engine, routing-engine, stage-filtering, stage-assignment,
stage-notifications, live-control).

Frontend: Pipeline wizard (17 components), jury stage pages (7),
applicant pipeline pages (3), public stage pages (2), admin pipeline
pages (5), shared stage components (3), SSE route, live hook.

Phase 6 refit: 23 routers/services migrated from roundId to stageId,
all frontend components refitted. Deleted round.ts (985 lines),
roundTemplate.ts, round-helpers.ts, round-settings.ts, round-type-settings.tsx,
10 legacy admin pages, 7 legacy jury pages, 3 legacy dialogs.

Phase 7 validation: 36 tests (10 unit + 8 integration files) all passing,
TypeScript 0 errors, Next.js build succeeds, 13 integrity checks,
legacy symbol sweep clean, auto-seed on first Docker startup.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-13 13:57:09 +01:00
98f4a957cc Performance optimization, applicant portal, and missing DB migration
Performance:
- Convert admin dashboard from SSR to client-side tRPC (fixes 503/ChunkLoadError)
- New dashboard.getStats tRPC endpoint batches 16 queries into single response
- Parallelize jury dashboard queries (assignments + gracePeriods via Promise.all)
- Add project.getFullDetail combined endpoint (project + assignments + stats)
- Configure Prisma connection pool (connection_limit=20, pool_timeout=10)
- Add optimizePackageImports for lucide-react tree-shaking
- Increase React Query staleTime from 1min to 5min

Applicant portal:
- Add applicant layout, nav, dashboard, documents, team, and mentor pages
- Add applicant router with document and team management endpoints
- Add chunk error recovery utility
- Update role nav and auth redirect for applicant role

Database:
- Add migration for missing schema elements (SpecialAward job tracking
  columns, WizardTemplate table, missing indexes)

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 11:04:26 +01:00